November 22, 2021

Ramp design case study – The townhouse development on the hill

Posted by David Beaton
Ramp design case study - The townhouse development on the hill

As we spoke about in our Q&A, it’s always best to call in a traffic engineer early if you’re developing on a challenging site.

That way, we can work with you to get a compliant, cost-effective ramp that adds value to your development.

We recently prepared a ramp design for a four-unit townhouse development in Doncaster of Melbourne’s northeast. What was unique about this site was the grade: it fell by more than seven metres from the back to the front!

The key constraint was the floor levels of the garages, which were set by building height requirements. Our design objective was to achieve a compliant ramp design whilst providing a cost-effective and constructible layout for the developer.

We retained the existing site crossover by utilising a curved ramp, substantially reducing potential costs due to reconstruction of the crossover and electricity pole relocation. Our innovative design included transitions and main ramps to achieve the grades required for each garage successfully.

Uncertain about a steep site? Talk to us, and we’ll develop a solution to challenging grades, so you can move forward with your development.

Get in contact with us today.

 

Posted by

David Beaton

Director

As the Founding Director of Quantum Traffic I have created a company that I have passion for, in creating a great organisation with strong relationships. With over 10 years experience in Traffic Engineering Consulting I have an in-depth knowledge of the industry and a broad skillset across many disciplines.

Recent News